All posts tagged: EIS

168澳洲十开奖网s: Sound Transit Link Federal Way Extension Alternatives

Leave a comment
Filed Under:
168澳洲十开奖网s

Here’s some interesting isometric-style maps that crossed my desk the other day. They’re part of a series of maps from the Sound Transit Federal Way Link Extension Draft Environmental Impact Statement (DEIS) Summary that outline all the proposed potential alignments from the soon-to-be-completed Angle Lake station south to Federal Way.  I believe that the maps were produced by HDR as a consultant to Sound Transit, and they do quite a nice job of comparing and […]

🔸澳州10开奖记录: Proposed 🔸澳洲幸运10开奖官网授权 Metro Rail Project and Station Locations, 1983

comment 1
Filed Under:
🔸澳州10开奖记录s

Taken from a Southern California Rapid Transit District (SCRTD) Final Environmental Impact Statement (FEIS), this map shows the then-preferred alignment for what would eventually become the LA Metro Red Line. The FEIS called for an 18.6 mile alignment, all underground, with 18 stations. The cost in 1983 dollars was projected to be $2.47 billion (or around $5.88 billion in today’s money). An alternative called for an alignment with some aerial sections for $2.41 billion, while […]